Yongbyon Nuclear Research Centre
Sanctioned entityNorth Korea. Named in 6 sanctions listings.
Summary
Major North Korean nuclear facility involved in the production of military-grade plutonium. The Centre is maintained by the General Bureau of Atomic Energy (KPe.007) and was designated by the European Union.
The Director Disqualification Sanction was imposed on 09/04/2025.
(UE) 2021/1300 du 05/08/2021 (UE Corée du Nord - Règlement (UE) 2017/1509) (FondementJuridique: 1156)
(UE) 2023/2576 du 13/11/2023 (ONU Corée du Nord - RCSNU 1718 (2006) et R (UE) 2017/1509) (FondementJuridique: 3660)
Installations capables de produire des matières fissiles à usages militaires, dont un réacteur de 5 MW(e), une installation de retraitement du plutonium (laboratoire radiochimique), un réacteur à eau légère (LWR) et une installation d’enrichissement de l’uranium signalée. Le centre dépend du Bureau général de l’énergie atomique (entité désignée par le CSNU le 16.7.2009). En juin 2024, l’Agence internationale de l’énergie atomique (AIEA) a déclaré avoir observé depuis décembre 2023 le rejet intermittent d’eau provenant du système de refroidissement du LWR à Yongbyon, ce qui correspond à une exploitation du LWR. L’AIEA a également détecté des signes continus d’exploitation du réacteur de 5 MW(e) et de l’installation d’enrichissement par centrifugation signalée. Dans son rapport de mars 2024, le groupe d’experts des Nations unies a aussi fait état d’une importante activité continue à Yongbyon. Les images satellite prises tout au long de l’année 2025 ont confirmé la poursuite des activités ainsi que l’achèvement de plusieurs nouveaux projets de construction.»
(UE) 2025/2558 (UE Corée du Nord - Règlement (UE) 2017/1509) (FondementJuridique: 4062)
(UE) 2022/1331 du 28/07/2022 (ONU Corée du Nord - RCSNU 1718 (2006) et R (UE) 2017/1509) (FondementJuridique: 2420)
Facilities capable of producing fissile material for military uses, including a 5MW (e) reactor, a plutonium reprocessing facility (radio-chemical laboratory), a Light Water Reactor (LWR) and a reported uranium enrichment facility. The Centre is maintained by the General Bureau of Atomic Energy (entity designated by the UNSC, 16.7.2009).
(Date of UN designation: 2009-12-22)
(UE) 2024/3152 du 16/12/2024 (UE Corée du Nord - Règlement (UE) 2017/1509) (FondementJuridique: 3851)
(UE) 2017/1509 du 30/08/2017- (UE Corée du Nord - Règlement (UE) 2017/1509) (FondementJuridique: 990)
Sanctions and listings6
North Korea Sanctions - (UE) 2025/2558 (UE Corée du Nord - Règlement (UE) 2017/1509); (UE) 2024/3152 du 16/12/2024 (UE Corée du Nord - Règlement (UE) 2017/1509); (UE) 2017/1509 du 30/08/2017- (UE Corée du Nord - Règlement (UE) 2017/1509); (UE) 2022/1331 du 28/07/2022 (ONU Corée du Nord - RCSNU 1718 (2006) et R (UE) 2017/1509); (UE) 2023/2576 du 13/11/2023 (ONU Corée du Nord - RCSNU 1718 (2006) et R (UE) 2017/1509); (UE) 2021/1300 du 05/08/2021 (UE Corée du Nord - Règlement (UE) 2017/1509)
Direction Générale du TrésorFrench National Asset Freezing SystemFrance
Installations capables de produire des matières fissiles à usages militaires, dont un réacteur de 5 MW(e), une installation de retraitement du plutonium (laboratoire radiochimique), un réacteur à eau légère (LWR) et une installation d’enrichissement de l’uranium signalée. Le centre dépend du Bureau général de l’énergie atomique (entité désignée par le CSNU le 16.7.2009). En juin 2024, l’Agence internationale de l’énergie atomique (AIEA) a déclaré avoir observé depuis décembre 2023 le rejet intermittent d’eau provenant du système de refroidissement du LWR à Yongbyon, ce qui correspond à une exploitation du LWR. L’AIEA a également détecté des signes continus d’exploitation du réacteur de 5 MW(e) et de l’installation d’enrichissement par centrifugation signalée. Dans son rapport de mars 2024, le groupe d’experts des Nations unies a aussi fait état d’une importante activité continue à Yongbyon. Les images satellite prises tout au long de l’année 2025 ont confirmé la poursuite des activités ainsi que l’achèvement de plusieurs nouveaux projets de construction.»
Programme UN-SC1718; EU-PRKReference EU.4222.57gels-avoirs.dgtresor.gouv.frsanctionsmap.euun.org
- Effective
- 31 Dec 2020
UK sanctions relating to the Democratic People’s Republic of Korea - The Democratic People's Republic of Korea (Sanctions) (EU Exit) Regulations 2019
UK; Foreign, Commonwealth & Development OfficeUK FCDO Sanctions ListUnited Kingdom
Asset freeze and director disqualification sanction
Research centre which has taken part in the production of the military-grade plutonium. Centre maintained by the General Bureau of Atomic Energy (entity designated by the United Nations, 16.07.2009)
Programme GB-DPRKReference DPR0066Reference 11040Last updated 9 Apr 2025gov.ukgov.uk
- Listed
- 16 Dec 2024
- Effective
- 22 Dec 2009
EU Restrictive Measures In Relation To The Non-Proliferation Of The Weapons Of Mass Destruction (WMD) - PRK
Directorate‑General for Financial Stability, Financial Services and Capital Markets UnionEU Financial Sanctions Files (FSF)European Union
Designation date published: 2009-12-22
regulationType=amendment; organisationType=council
2024/3152 (OJ L16122024)
Programme EU-PRKReference EU.4222.57eur-lex.europa.eusanctionsmap.eu
Official designation
Ministry of Economy, Trade and IndustryJapan METI End User ListJapan
Weapon Types: Nuclear
- Listed
- 1 Aug 2022; 14 Nov 2023; 16 Dec 2024
EU Restrictive Measures In Relation To The Non-Proliferation Of The Weapons Of Mass Destruction (WMD)
Federal Public Service FinanceBelgian Financial SanctionsBelgium
2024/3152 (OJ L16122024)
2023/2576 (OJ L14112023)
2022/1331 (OJ L201)
Programme EU-PRKfinance.belgium.besanctionsmap.eu
Official designation
La Principauté de MonacoMonaco National Fund Freezing ListMonaco
(UE) 2021/1300 du 06/08/2021, (ue) 2023/2576 du 13/11/2023, (ue) 2022/1331 du 28/07/2022, (ue) 2017/1509 du 30/08/2017, (ue) 2025/2558 du 15/12/2025 and (ue) 2024/3152 du 16/12/2024
Autorité de désignation publiée : Union européenne
Installations capables de produire des matières fissiles à usages militaires, dont un réacteur de 5 MW(e), une installation de retraitement du plutonium (laboratoire radiochimique), un réacteur à eau légère (LWR) et une installation d’enrichissement de l’uranium signalée. Le centre dépend du Bureau général de l’énergie atomique (entité désignée par le CSNU le 16/07/2009). En juin 2024, l’Agence internationale de l’énergie atomique (AIEA) a déclaré avoir observé depuis décembre 2023 le rejet intermittent d’eau provenant du système de refroidissement du LWR à Yongbyon, ce qui correspond à une exploitation du LWR. L’AIEA a également détecté des signes continus d’exploitation du réacteur de 5 MW(e) et de l’installation d’enrichissement par centrifugation signalée. Dans son rapport de mars 2024, le groupe d’experts des Nations unies a aussi fait état d’une importante activité continue à Yongbyon. Les images satellite prises tout au long de l’année 2025 ont confirmé la poursuite des activités ainsi que l’achèvement de plusieurs nouveaux projets de construction.
Connections3
Members and officers2
All 2 markedSanctioned- Former Technical DirectorNorth Korea
- Hong-Sop RICounter-sanctioned entityDebarredExport controlledFormer DirectorBorn 26 Feb 1940North Korea
Other links1
- General Bureau of Atomic Energy (GBAE)Counter-sanctioned entitySanctionedDebarredExport controlledLinked from"The General Bureau of Atomic Energy maintains the Yongbyon Nuclear Research Centre"Saint Kitts and NevisUnited StatesNorth Korea
Other names29
Also known as29
Show 11 moreShow fewer
Addresses19
39°46'50" N 125°45'08" E
39°45′57″N 125°46′08″E
39°46'52.67"N 125°45'10.84"E
39°47′39″N125°45′18″E
39°46′33″ N 125°45′27″ E
39°46′43″ N 125°45′09″ E
39°47′17″N 125°45′43″E
39°47′38″ N 125°45′21″ E
39°47′39″ N 125°45′18″ E
39°48′22″N 125°44′25″E
39°46′15″ N125°44′57″E
39°46′49″ N 125°45′24″ E
39°46'13.84"N 125°44'58.94"E
39°47′43″ N 125°45′15″ E
39°47′51″N 125°45′20″E
39°47'44.53"N 125°45'19.05"E
39°47′20″N125°45′46″E
40°02′24″N 125°18′22″E
40°01′51″N 125°18′28″E
This page shows the public record as its publishers state it. A name here is not by itself a finding: whether a record refers to a particular person or company is what screening decides. Read the full notice.